A suitable location and the right connections are the starting point for your MINIFINITY. Before site preparation, the requirements for your configuration must be agreed with your Flagship Store or your certified partner.

Dimensions at a glance

AreaDimensions
Exterior cladding: length × width2,738 × 2,098 mm
Width at the upper edge2,104 mm
Overall height, High version950 mm
Overall height, Low version750 mm
Open water surface1,886 × 1,489 mm ≈ 2.81 m²
Required footprint5.744 m²

These dimensions refer to the specified areas. Additional clearance for access, positioning and servicing must be planned separately.

Weights & area loads

ConditionHIGHLOW
Pool without waterapprox. 411 kgapprox. 367 kg
Pool filled with water, no occupantsapprox. 3,020 kgapprox. 2,414 kg
Pool filled with water + 2 peopleapprox. 3,220 kgapprox. 2,614 kg
Pool filled with water + 4 peopleapprox. 3,420 kgapprox. 2,814 kg
Average load per square metre with 4 peopleapprox. 595 kg/m²approx. 490 kg/m²

Preliminary, rounded planning values (13 October 2026). Assumed weight: 100 kg per person. Area load: calculated average over 5.744 m²; not evidence of local support loads.

Location & load-bearing capacity

The base must be suitable, level and have sufficient load-bearing capacity. The assessment must account for the combined weight of MINIFINITY, the water and the users, as well as how this load is distributed over the supporting area. For rooftop terraces, balconies and other structurally sensitive locations, qualified specialists must assess load-bearing capacity and local site requirements.

Important: Structural approval required

Before installation, you must arrange for a qualified structural engineer to check the total weight of your MINIFINITY, including water and occupants, and the permissible load per square metre and load-bearing capacity of your terrace, rooftop terrace or balcony. The proposed location must be expressly approved for this load. The stated average loads do not replace a site-specific structural assessment.

Access & connections

The connections required for your configuration and the arrangements for access, unloading and any necessary lifting equipment must be clarified beforehand. Connection, filling and commissioning follow professional positioning. The technical service area must remain accessible for maintenance and servicing.

Planning information for your configuration

Before site preparation, the confirmed weight and load data, connection requirements and necessary clearances must be established using the technical documentation for your chosen configuration. This overview does not replace the installation instructions or a site-specific technical assessment.